Geosan0 - One RIC tidbit for Wesamac
COSTS
• Net Life of Mine capital totals C$681 million, including the capitalized net preproduction
revenue.
• Net pre-production capital requirements total C$503 million.
• Average operating cost over the mine life is C$46.15 per tonne milled.
The economic analysis shows that at a long-term gold price of US$1,300/oz Au, the
Project has a pre-tax Net Present Value (NPV) at an 8% discount rate of negative $32
million. Total pre-tax undiscounted cash flow is C$405 million.