Maple GasIf I understand Port Rupert's schedule Maple Gas should be the next ship to be loaded at the terminal after the ship that's at the terminal now. I have no knowledge of how long a ship typically sits at anchor waiting to be loaded. Is Rupert terminal unusually slow? I believe at least three ships will be required to keep up the two loadings per month. Perhaps Laurel Prime which was commissioned a few months ago and Prince Rupert was named as a destination.