Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Quote  |  Bullboard  |  News  |  Opinion  |  Profile  |  Peers  |  Filings  |  Financials  |  Options  |  Price History  |  Ratios  |  Ownership  |  Insiders  |  Valuation

Orbite Technologies Inc EORBF

Orbite Technologies Inc is a Canada-based mineral-processing and resource development company. The firm is organised into the following segments; Specialty Products, Waste Monetization and Commodity Minerals. It produces alumina, silica, hematite, magnesium oxide, titanium oxide, smelter-grade alumina, rare earth oxides and rare metal oxides. The operation plant is based in Canada.


GREY:EORBF - Post by User

Post by marcm711on Jun 22, 2019 12:14pm
469 Views
Post# 29852547

Orbite Shuts down Operations-Post Online Media

Orbite Shuts down Operations-Post Online Media

Orbite Shuts down Operations in HPA Plant due to problems with calcination equipment

Share on Twitter Share on LinkedIn
Christian Fernsby |
 
 
Orbite Technologies
Canadian businesses   The start-up bed of amorphous HPA was injected into the decomposer
 

Orbite Technologies announced the shutdown of operations at the HPA Plant due to technical problems with the Outotec calcination equipment.

As previously disclosed, the start-up bed of amorphous HPA was injected into the decomposer and it was filled to its operational level. The upstream hydrometallurgical section was also in full operation and ACH crystal transfer into the decomposer had commenced.

Purity of the ACH material produced in the hydrometallurgical section is excellent and is superior to 5N purity (5N+ HPA equivalent).

Orbite successfully operated the decomposer over several weeks and reached ACH crystal injection rates of 5 tpd (equivalent to1 tpd of HPA) and maintained a steady injection rate between 3 and 4 tpd for 4 days.

The transfer of gamma HPA from the decomposer into the calciner was successfully done at rates up to 2.5 tpd of HPA.

The calciner was almost filled to operating levels and Orbite was starting to discharge HPA from the calciner when operations observed abnormal variations with the material fluidisation in the calciner bed, leading to the breakage of four ceramic heating tubes in the calciner and one ceramic heating tube in the decomposer.

After careful analysis of the available data with Outotec’s onsite representative, Orbite has determined that despite the numerous modifications made to the calcination system over the past several months, the electrical heating system, as designed and supplied by Outotec, is not robust enough to reliably achieve the production of HPA without experiencing breakages and production slow downs.

After discussions with its legal advisors and the court appointed Monitor, the Company has determined there is not enough time or financial resources to try to once again address the technical issues encountered with the Outotec supplied equipment whilst remaining under CCAA protection.

https://www.poandpo.com/companies/orbite-shuts-down-operations-in-hpa-plant-due-to-problems-with-calcination-equipment-226201986/
<< Previous
Bullboard Posts
Next >>