RE:RE:Next step out holeSeems reasonable to me that the on site drill would have moved to one of the infill site drill pads that were part of the plan and already prepped, probably a 100 meter step back, just in case the the step out missed. The addition of the second rig would be to test a further step out, probably outside the drilling plan for 2019, but would also require setting up a new drill site. I don’t expect any further step out results before late September, and there may not even be any more step out holes this season. The second drill is possibly just to provide tight enough spacing to turn some of the resources into reserves.