GREY:ARGEF - Post by User
Comment by
Menace46on Aug 31, 2019 1:49pm
112 Views
Post# 30086187
RE:RE:RE:RE:It’s all over ...
RE:RE:RE:RE:It’s all over ...I’m positive that if the ECEC & Hung Thinh would have had the engineering package we would have seen at least some sort of bidding activity. One would have to think either of them would have jumped at the opportunity to own the tech outright easily outbidding Alnaimi... Wouldn’t surprise me if the rejected bidder was just trying to stall until the engineering package became available....