RE:RE:Mark Selby about Beta Hunt mine potential (pre-HGO). July/August production: ~7500 oz/mo = 250 oz/day = 250 x 31 = 7750 gpd. At 3gpt 7750/3gpd = 2583 tonnes (metric ton) a day or ~2600 tpd. The ramp can support 3000 tpd, and the mill capacity is 3800 tpd. So, can that riddle now be solved?
A much simpler math can be carried out, in one's head, by using some approximate value, e.g. grade at 3.1 gpt, so 31g per oz / 3.1 gpt = 10.
Simpler Math: 250 ozpd x 31/3.1 = 250 x10 = 2500 tpd (supportable by the ramp...and the mill).
GH11
------------------------------
Pandora wrote: "Will look to re ramp up the lower grade production in the second half of next year and again, given the scale of the asset we know the ramp can do 3,000 tonnes a day."
And is that what is happening?