RE:20’ of 0.35 oz/t in hole 3That’s the 6 m of 11 g converted. I did that because 10 ft. Of 0.3 ozpt is a very general measuring stick/barometer of min. mineable width and grade (underground) for a feasible deposit. Proximity to infrastructure, gold price, etc. are all key factors, but like I said, it’s a broad guideline...
And 3 of our first 4 holes produced intersections wider and grades equivalent or higher.