RE:RE:RE:RE:News out today..................Hey Seinfeld, no BS with me man. I have a fairly large position here and want nothing but the best for Marathon shareholders. But, the holes were drilled pretty close to perpendicular and the majority of the highlighted intersections with the better grades are down 200 to 320 meters. That is the bottom of the open pit, which truly is a long way down and a lot of waste to remove to get to it. Thankfully, Marathon as resources to the NE that can be mined and support the stripping. It will all come out in the feasibility study.