TSXV:CART.H - Post by User
Post by
loubastoneon Nov 25, 2019 3:57pm
200 Views
Post# 30390644
NRU potential output
NRU potential outputhttps://www.cubenergyinc.com/_resources/news/nr_2016_03_16.pdf In December 2015, a workover to recomplete the RK-23 well to the L-1 Upper was successful and the well is currently producing approximately 1.3 MMcf/d. In January 2016, a workover at RK-21 set a retrievable plug above the current open perforations in the D-2 through D-3 Lower reservoirs and opened the D-0 reservoir for production. The workover was successfully completed and the well is on production at approximately 1.3 MMcf/d.