RE:RE:Day 5 of testing?If they can somehow find 1 mmcf at the bottom of Dev, then they can surely find 2 to 3 mmcf elsewhere in the basin.
If they can find 3 mmcf as a 125 m vertical, then they can extend to 300 m vertical screen zone that will do 6 mmcf. Still dreaming of a horizontal well.
Looking for multiples of whatever we can find at the bottom of Dev!
bigreturn11 wrote: 0.2 mmcf would be a minor letdown
0.5 mmcf would be good
0.5 to 1.0 mmcf would be great.
1.0+ mmcf would be beyond everyone’s expectations.
I still see $3+ after the next NR (early to mid next week??).
FOMO kicking in yet???? I see $1.50 by Friday.
waitingstill wrote: On Nov 29th, VLE stated that the plugs had been drilled out and production tubing was being inserted to begin testing...
"The plugs between the three stimulated zones have been drilled out and production tubing is now being installed in preparation for the comingled flow test."
I am guessing one day for the tubing installation which means testing could have begun on Nov 30, and that today would be the end of day 5 of testing. The company also says the testing would be of similar duration as Ina which was about 10 days. Does that mean a NR is coming Tues morning as Monday will be Day 10 of testing.
Will we beat Dr. Guest's minimum required of 0.2mmcf? Will we beat GS's BSs 0.5mmcf minimum required? Will we beat GS's BSs latest prediction of 1.0mmcf? Exciting time for VLE holders. Looking forward to next week!
[/quot