RE:RE:RE:RE:RE:RE:Firstworld thoughts?TheRock077 wrote: The plugs between the three stimulated zones have been drilled out and production tubing is now being installed in preparation for the commingled flow test.
The company does not intend to produce the well at an aggregate of the three individual test rates, but rather intends to production test the well under rate-controlled conditions to measure longer-term flow stability.
Yeah, and the decline rate is astronomical!
But keep trying, scumbag