Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Quote  |  Bullboard  |  News  |  Opinion  |  Profile  |  Peers  |  Filings  |  Financials  |  Options  |  Price History  |  Ratios  |  Ownership  |  Insiders  |  Valuation

Golden Goliath Resources Ltd V.GNG

Alternate Symbol(s):  GGTHF

Golden Goliath Resources Ltd. is a Canada-based junior exploration company. The Company is focused on exploring and developing the gold and silver potential of properties in the Red Lake District of Ontario. The Company’s Canada properties include Quebec, and Wish Ore. Queb includes Victory 21 Property, Citadell Property, Bedard Property, and Ernest Property. The Victory 21 Property includes about 18 map claims, 10 pending claims over 1200 hectares. The Citadell Property, Bedard Property and Ernest Property are located in Central Quebec, stable modern mining jurisdiction, which includes about 24, 22, and 34 map claims. The Wish Ore Property is located 60 kilometers north of Sault Ste Marie.


TSXV:GNG - Post by User

Post by radcaton Dec 16, 2019 11:03am
101 Views
Post# 30459227

BTU News!! TNT

BTU News!! TNT
 

BTU INTERSECTS COPPER GOLD SILVER MINERALIZATION OVER CORE LENGTH OF 44.3 METRES AT TNT

December 16th, 2019, Vancouver, BC, Canada – BTU METALS CORP. ("BTU" or the "Company") (BTU-TSX:V)  announces the  drill core assay results from the new TNT target that could potentially host gold enriched volcanogenic massive sulphide (“VMS”) mineralization.  Hole 13, the polymetallic discovery hole, intersected mineralogy, alteration, and mineralization consistent with the footwall (stockwork) of a VMS system. Polymetallic mineralization was encountered at above background levels intermittently throughout the hole, however the grade and continuity of mineralization was markedly improved beginning at about 280 metres down hole (200 m vertical) and continued to the end of the hole.

Highlights:

TNT

  • Highlight assays from discovery hole 13 include:
    • 44.3m of 1.14% Cu equivalent mineralization, including 30 m of 1.46% CuEq which contains 9.9 m of 2.05% CuEq and a separate interval of 7.2 m of 2.02% CuEq
    • Best copper and silver values came from a 1.2 m sample (313.2 – 314.4 m) which assayed 5.56% Cu, 99.6 g/t Ag, and 0.487 g/t Au (6.83% CuEq)
    • Best gold value came from a 0.8 m sample (339.35 – 340.15 m) which assayed 2 g/t Au, 26.9 g/t Ag, and 0.72% Cu (2.43% CuEq)
  • Drill holes 19-22 in the TNT zone complete and being processed for assay
  • Drill holes 23-24 to be complete pre-Christmas
  • On recently acquired Dixie Halo East-Extension ground, exploration planned once work permits are received

Dixie Creek 

  • SGH samples currently at Actlabs for processing
  • Interpretation and further drill target selection on the mafic-felsic contact (LP Fault) to follow
  • Additional line cutting underway and additional Induced Polarization and ground magnetic surveying planned

Table 1: BTU-19-13 assay results

Drill Hole

From

To

Thickness

Au

Ag

Cu

CuEq

 

(m)

(m)

(m)

(g/t)

(g/t)

(%)

(%)

BTU-19-13

279.55

280.55

1.00

0.210

30.40

1.35

1.78

 

299.70

344.00

44.30

0.161

17.77

0.86

1.14

including

313.20

343.20

30.00

0.209

22.44

1.10

1.46

including

313.20

323.10

9.90

0.243

30.22

1.59

2.05

including

313.20

314.40

1.20

0.487

99.60

5.56

6.83

including

336.00

343.20

7.20

0.425

30.67

1.43

2.02

including

339.35

340.15

0.80

2.010

26.90

0.72

2.43

 

354.30

365.00

10.70

0.334

7.24

0.31

0.62

Metal equivalency based on US$2.70/lb Cu, US$1350/oz Au, and US$17/oz Ag; noting that no adjustments were made in the metal equivalency calculation for metal recovery, as this is still an early stage project.

Table 2: Drill hole collar information

Drill Hole

Azimuth (°)

Dip (°)

UTM E (m)

UTM N (m)

BTU-19-12

274

-42.2

462985

5628489

BTU-19-13

90

-46.5

462970

5628489

Figure 1: Overview of BTU Metals Dixie Halo Property

Drilling is ongoing to further explore the TNT target to the east and south of the location of hole 13, the polymetallic discovery hole. The Company has begun undertaking work planned to define the full scope of the TNT chargeability target and understands the footprint of the target to be at least 1000 metres north-south and between 200 and 500 metres east-west as defined by IP chargeability and resistivity survey data (Figure 2). The target remains open both to the north and to the south.

BTU CEO Paul Wood commented; “We are extremely pleased to announce the first assays from our new TNT target Cu-Au-Ag discovery. New VMS-type discoveries are very rare these days and our geological team found the TNT mineralization with the first diamond drilling completed on the target. It has to be emphasized that the very large TNT target, potentially a VMS system, is different from what has traditionally been seen in Red Lake, including what’s elsewhere on BTU properties. A potential base metal, polymetallic system, in a mining friendly jurisdiction, close to infrastructure with year-round access is very exciting. In the past few weeks, BTU’s work on the TNT target has included additional airborne and ground geophysical surveying, induced polarization and horizontal loop electromagnetic surveying as well as soil geochemical surveys. Drilling continues and more results will be released as they become available. We also look forward to providing updates on the Dixie Creek target once SGH assay results are returned to further pursue the high grade gold targets contiguous to Great Bear Resources.” 

At TNT, drill hole 13 was drilled as a result of certain geology seen in hole 12 and on what is now interpreted to be the western extremity of the TNT target. Hole 12 results, while not particularly high, were significant in the determination of the location and direction of the location of hole 13. This area is marginal to the strongest part of the chargeability feature and a low resistivity feature. Results of the recently completed VTEM survey show the TNT Target extending as a conductive feature beginning to the south of hole 13 and this zone of higher conductivity is interpreted to be related to a higher sulphide concentration, possibly  gold enriched volcanogenic massive sulphide (“VMS”) style mineralization. The initial drilling completed on the new polymetallic TNT Target was completed to the north of the conductive part of the VTEM target. The data from the VTEM survey also indicate the presence of a large ‘airborne IP effect’ anomaly extending for several hundred metres north of the location of hole 13.

Holes 19 and 20 were drilled to the East of hole 13 while recently completed holes 21 and 22 were drilled approximately 800 metres to the south of where 13,19 and 20 were drilled. Split core samples from holes 19 and 20 are currently at the laboratory for analysis. Bedrock in the entire area of the interpreted TNT target is overlain with overburden and no drilling is reported on the area currently covered by the new geophysical surveys. Strong alteration and significant pyrite as well as some chalcopyrite was found in each location drilled to date. Minor amounts of galena, sphalerite and molybdenite were also noted in some of the holes.

Figure 2: IP Anomaly Map of the TNT Target Area shows the current limits of the IP surveying and the extent of the interpreted TNT target

The Company has applied for additional work permits in the area on the recently acquired ground and intends to expand its geophysical survey limits both on the ground and in the air in the coming winter months.

Rock types intersected in the drilling to date include highly altered and bleached basalt, rhyodacite tuffs and flows as well as felsic and mafic intrusive bodies. Mineralization intersected in the holes completed to date is comprised of strong disseminated pyrite with scattered disseminated to occasional stringer chalcopyrite.

To view pictures of holes 12 and 13 core please visit the Company’s website here: www.btumetals.com/core. Note: core pictures are for general interest only and are selected samples. The pictures should not be considered to represent the entire mineralized interval.

 

 

Bullboard Posts