Capstone Steps Out Into 6.3m of 5.3% Cu: Expansion and Infil Capstone Steps Out Into 6.3m of 5.3% Cu: Expansion and Infill Drilling Amongst the Best Results Ever at Cozamin
VANCOUVER, British Columbia -- (Business Wire) --
Capstone Mining Corp. (“Capstone” or the “Company”) (TSX:CS) announces additional high grade copper and silver results from 21 infill and 6 step out drill holes at its Cozamin Mine, further to the update of December 2, 2019. This brings the total drilled to date to 150 holes of a 200 hole program, aiming to double the current reserve base. Drill results to date continue to demonstrate greater widths and grades than current Mineral Reserves, as well as the potential for an expanded high grade resource. Mineral Resource and Mineral Reserve estimates will be updated in late 2020. Cozamin is expected to achieve a 50% increase to annual copper and silver production of 50 to 55 million pounds and 1.5 million ounces, respectively, by 2021.
This press release features multimedia. View the full release here: https://www.businesswire.com/news/home/20200116005251/en/