GREY:RNKLF - Post by User
Post by
pierregon Jan 23, 2020 9:37am
63 Views
Post# 30588065
Fairplay North Open Pit Operations.
Fairplay North Open Pit Operations.Fairplay North Open Pit Operations.
https://www.rncminerals.com/2020-01-23-RNC-Minerals-Provides-2020-Production-Cost-Guidance-and-Strong-Operational-Update
« Fairplay North is the next open pit in the HGO production pipeline, located less than 1km from the HGO treatment plant.
First mineralization has been mined and delivered to HGO Run-of-Mine ("ROM") stockpile for processing.
Fairplay North Stage 1 mining is planned through to July 2020, followed by Stage 2 through to January 2021.
High-grade results from recent drilling include (drill intervals are estimated true thickness):
FPNGC_1305-078 - 16.5 g/t over 16m from 24m (including 59.8g/t over 4m)
FPNGC_1305-083 - 5.8 g/t over 13m from 25m. »