OTCQX:NTGSF - Post by User
Comment by
easycoderon Jan 29, 2020 8:37am
76 Views
Post# 30613193
RE:Connecting the dots - new PR
RE:Connecting the dots - new PRExcerpt:-
PROJECT OVERVIEW Heap Leach Reprocessing Study: Phase 1 Kappes Cassiday is currently conducting a feasibility level study to determine the parameters for the phase 1 plan to reprocess the material on the heap leach pad.
The study will include detailed analysis of all the key parameters involved in reconstructing necessary infrastructure including the ADR plant, assay lab and all projected capital and operating costs, production levels and the projected economic return.
The study is focusing on remediating and reprocessing the heap leach pad as a means of fast-tracking redevelopment of the site.
The study will include a project implementation schedule,sourcing, and economic cash flow model sufficiently detailed to move directly into procurement, development and operations if economically warranted. Any production decisions would be based on the outcome of this feasibility level study demonstrating technical and economic viability.