RE:RE:Dreamers Fulogas1, Cypress Development Corp Nevada project really has a 300 year mine life. CYP has been testing only the starter pit.
I had the same thought many might be thinking now. So I already asked Don Myers this question.
The question is/was what about the whole area not being the starter pit? Is it the same as the starter pit? Does it need a whole lot of testing too? Will Billl's successfull flowsheet work as well on the starter pit as on the whole area outside the starter pit?...............YES!!
The good thing to keep in mind is that :
"Drilling Cypress conducted drilling exploration within the project area in 2017 and early 2018. A total of
23 vertical, NQsize (1.87in core diameter) core holes were drilled to date. Drill hole depths range from 33 to 129.5 meters (108 to 425 feet), totaling 1,904 meters drilled. Given the shallow depth of the holes, no downhole surveys were completed. The drilling results generally indicate a particularly favorable section of ashrich mudstones that extend to depths of up to approximately 120 meters, within which exists a strong, apparently planar, oxidation/reduction front.
While the drill holes are widely spaced, averaging 650 to 700 meters between holes,
the lithium profile with depth is consistent from hole to hole. Unweighted lithium content averages 929.8 ppm for all 665 samples assayed, with a range of 116 to 2,240 ppm
BTW, the 23 holes do not count the 6 infill holes done at a latter date when we got a PR saying:
"Five to 10 additional holes are recommended in
the initial pit area for resource conversion and development, with a goal of converting some of the Indicated resource to the Measured category and most of the Inferred resource to the Indicated or Measured categories
https://www.cypressdevelopmentcorp.com/investors/update-from-the-field/