I don't read this as reduction in mine lifeThis area of drilling represents a small portion of the overall lithium resource on the property and is expected to support the design basis of production for the first 18 years of the project
Are they not talking about the higher grade section from recent drilling representing the first 18 years of a longer mining plan?