Highlights 1.27 grams per tonne over 164.3
- In 2011, previous Jefferson Project operators drilled four holes, all encountering gold mineralization, including 83.5m at 1.71g/T
- JEF-108 which intersected 22.9 metres averaging 1.3 grams per tonne, including 8.5 metres of 1.8 grams per tonne (from depth of 100.6 meters to 123.4 meters); and,
- JEF-109 which intersected 12.2 metres of 1.55 grams per tonne (from depth of 79.2 metres to 91.4 metres).
the Jefferson Project is adjacent, on the southwest boundary, to Buzzard, a high-grade epithermal gold project similar to Haile and geologically linked to Brewer.
Drilling by Dr. Capps at Buzzard returned multiple high-grade, near-surface gold intersections including: 6 meters of 27.97 grams per tonne, 35.3 meters of 9.76 grams per tonne, 44.7 meters of 7.07 grams per tonne, and 15 meters of 5.72 grams per tonne.