RE:RE:RE:Sea having another Q&M session Hey I didn't even mention the high grade open pit of about 9 million ozs of gold that is mentioned in the snowden report.
snowden report 2012 on open pit gold at brucejack
Table 14.24 Brucejack Grade-tonnage estimate (Open Cut sensitivity) based on a cut- off grade of 0.5 g/t AuEq – September 2012(1)(4)(5)
M+I reserve
107 million tonnes of 2.86 grams f gold per tonne. Plue 25.8 grams of silver. --- 9,9 million ozs of gold
On page 110 of 118
https://s23.q4cdn.com/277467366/files/doc_downloads/technical_reports/Brucejack-Interim-Resource-Estimate-43-101-Sept-2012.pdf
Table 14.25 Brucejack Grade-tonnage estimate (Open Cut sensitivity) based on a cut- off grade of 1.0 g/t AuEq – September 2012(1)(4)(5)
M+I reserve 62.7 million tonnes of 4.48 grams per tonne gold and 39.4 ozs of silver. 9 million ozs of gold...