RE:RE:RE:RE:RE:RE:Well Current work is the IP survey followed by Drilling end of July/early Aug..9 drill holes already confirmed..
The IP survey the Company is about to conduct is the continuation of the 2019 work in the areas shown to be most promising by the Airborne geophysical survey recently conducted on Kwai. The results are expected to increase the number of drill targets and are eagerly anticipated.
The program of till sampling geochemistry on the property is designed to help prioritize the drill targets. The goal of the current IP and geochemistry program is to add to the number of existing drill targets on the Kwai property and to prioritize those targets in preparation for diamond drilling, which is the next planned step on the property. The Company is now mobilizing both the IP crew and the geochem crew to Ear Falls, Ontario to conduct the work, which is anticipated to take approximately 35 field days to complete. The Company would like to conduct the first ever diamond drilling on Kwai as soon as possible after the results of the IP and Geochem are compiled and interpreted.