Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Quote  |  Bullboard  |  News  |  Opinion  |  Profile  |  Peers  |  Filings  |  Financials  |  Options  |  Price History  |  Ratios  |  Ownership  |  Insiders  |  Valuation

Lundin Gold Inc T.LUG

Alternate Symbol(s):  LUGDF

Lundin Gold Inc. is a Canada-based mining company. The Company owns the Fruta del Norte gold mine in southeast Ecuador and a large exploration land package that hosts the Fruta del Norte deposit at its northern edge. The deposit is hosted in the La Zarza concession, located in the 38 square kilometers (km2) Suarez Pull-Apart Basin. Fruta del Norte deposit is located within a 150 kilometers (km) long copper-gold metallogenic sub-province in the Cordillera del Condor region in southeastern Ecuador. The Company’s properties in Southeast Ecuador consists of over 28 metallic mineral concessions and three construction materials concessions covering an area of approximately 64,454 hectares. From this, Fruta del Norte is comprised of seven concessions covering an area of approximately 5,566 hectares and is located approximately 142 km east-northeast of the City of Loja in southeastern Ecuador. Fruta del Norte deposit is an intermediate sulphidation epithermal gold-silver deposit.


TSX:LUG - Post by User

Bullboard Posts
Post by woolcoon Jul 06, 2020 7:20am
151 Views
Post# 31227291

Here we go!! Cash Cow back in Full Action!

Here we go!! Cash Cow back in Full Action!

VANCOUVER, BCJuly 5, 2020 /CNW/ - Lundin Gold Inc. ("Lundin Gold" or the "Company") (TSX: LUG) (Nasdaq Stockholm: LUG) is pleased to announce that operations at its Fruta del Norte gold mine in Ecuador ("Fruta del Norte") have restarted. The Company anticipates resuming regular shipping of concentrate to the port within the next few days.

The mill is currently processing ore from stockpile and the mine at a rate of approximately 2,800 tonnes per day and is expected to ramp up to 3,500 tonnes per day over the next two months.  The mine has resumed producing ore, and production is planned to ramp up over the next three months.  The Company's activities include strict COVID-19 protocols intended to minimize risks to the health and safety of all personnel, contractors, and local communities.

"I want to thank all of our staff for their efforts and dedication during these challenging times, especially the team who has been at site since operations were suspended in March," said Ron Hochstein, President and CEO of Lundin Gold.  "Their work and dedication, which included the planning and implementation of new COVID-19 protocols and changes in procedures at site, were critical to ensuring a safe restart of operations."

Work on the completion of the South Ventilation Raise ("SVR") is also well advanced.  The SVR has been filled with concrete due to localized ground fall.  Once the concrete cures, the Company will grout the raise prior to the start of raise boring.  Work on the SVR is anticipated to be completed in Q4 2020.  The timing of this work does not impact planned production in 2020.

2020 Production Outlook

Gold production at Fruta del Norte for the second half of 2020 is estimated to be in the range of 150,000 to 170,000 ounces.  Together with actual production achieved prior to the onset of the temporary suspension, total 2020 gold production is estimated to be between 200,000 and 220,000 ounces.  Average mill production in the second half of 2020 is projected at 3,200 tonnes per day at an estimated average head grade of 10 grams per tonne.  Average gold recovery is anticipated to be approximately 85% during this time and is expected to reach design levels of 92% in late Q4 2020.

All-in-Sustaining-Costs ("AISC")1,2 for the second half of 2020 is expected to range between $770 and $850 per ounce of gold sold.  AISC for the second half of 2020 reflects additional COVID-19 costs and the ramping up of production originally anticipated to have occurred once commercial production was achieved in February 2020.  AISC includes $10.4 million in sustaining capital that includes costs for the tailings dam raise, the purchase of surface mobile equipment and other efficiency improvement projects.

1

Refer to the "Non-IFRS Financial Performance Measures" section at the end of this news release for reconciliation.

2

All amounts are in U.S. dollars unless otherwise indicated.

About Lundin Gold

Bullboard Posts