RE:RE:Nice read. Plasma Torch in Cement industrie.The modelling is done for each clients specific Induration furnace setup ....without it, it would be like going to the auto parts counter and asking them for an alternator....when they asked what car you have, you say any car...just give me an alternator, they all work the same....
hemi3tc wrote: If plasma torches need modelling. Is there some sort of non linear control needed ? If your changing the current does a linear increase in amps produce a linear or non linear temperature change.?
farfaraway wrote: Hi,
found a Master Thesis from 2019, Sweden. It was in cooperation with Cementa SE whom are part of German Heidelberg Cement Group AG (12,2 B market cap). They are worlds #1 in aggregates, #2 in cement and #3 in
ready-mixed concrete. We should introduce them to PYR.
The results of modelling plasma torches indicated that it is feasible to replace the fuel burners with plasma torches in the rotary kiln. To validate this result, calculations on the gas temperature profile in the kiln need to be performed to investigate if the required temperatures can be reached.