RE:RE:RE:RE:Brother. Thanks Now for the bright side. We have 300-400 tons of sorted ore ready to be put through flotation circuits. Grade is somewhere between 300-600 oz/t = 90,000 - 240,000 ozs. If we have a small 10T smelter with a good feed regimine to give continual production we save 20% which is a shipping to private smelter cost. Looking like 2 million is going to get covered fast. Then we should be in the 100T per day heading to 200T per day after systems streamlined.