RE:News : Drill results from Goldboro 5,500-metre drill programIt seem's quite consistant with previous results, which is good. Half of holes still need to be reported.
Nice that they expand the drill program with 9500 m, time is to drill and to speed-up the project.
PFS will certainly be announced at the end of the year because of this expanded drill program, for the better. "
we have initiated a further 9,500 metres of drilling to bring the drill program to 15,000 metres" " Selected composited highlights from the Drill Program include:
- 16.79 grams per tonne ("g/t") gold over 3.0 metres (113.0 to 116.0 metres) in hole BR-20-111;
- 9.78 g/t gold over 5.0 metres (353.0 to 358.0 metres) including 46.86 g/t over 1.0 metre in hole BR-20-114;
- 11.11 g/t gold over 3.7 metres (154.3 to 158.0 metres) in hole BR-20-108;
- 19.39 g/t gold over 1.0 metre (87.0 to 88.0 metres) in hole BR-20-107;
- 23.22 g/t gold over 1.0 metre (97.0 to 98.0 metres) in hole BR-20-109;
- 16.73 g/t gold over 1.0 metre (194.0 to 195.0 metres) in hole BR-20-112; and
- 27.46 g/t gold over 1.0 metre (230.0 to 231.0 metres) within a zone grading 2.54 g/t gold over 14.0 metres in hole BR-20-113. "