RE:RE:RE:RE:RE:RE:RE:Ten torches probably enough Perhaps the company is ensuring it can obtain the required station service transformer needed to power 50 torches? This isn't something they would be capable of without an upgrade to their in house electrical bus system. Once power requirements are satisfied then they can finalize torch contracts? Just a thought.
these things take time. Especially if your dealing with a large public electrical grid operator. Patients are required , as they move fast for no one