Double check assays cause high grade gold Assay results of core samples from the drill holes have been severely delayed by overloading at the analytical laboratory. Problems related to COVID-19 safety protocols have been compounded by a rapid uptick in drill activity worldwide. Mt. Hinton core processing has been further delayed by the very rigorous sampling, sample preparation and analytical techniques being used to ensure that the results are as reliable as possible given the presence of coarse gold in some veins. To date, assay results are only available for one complete hole and two partial holes. These results are still subject to compilation and quality assurance/quality control review. Ideally, the first news release will be made in about two weeks and will comprise holes spanning the entire width of the first section line across the Granite North zone. A comprehensive section should provide a better idea of the distribution and character of the mineralization. The drilling and sampling programs are designed to evaluate potential for both bulk-tonnage and discrete vein targets.