RE:QuestionGonat my guess is that they will be drilling 7 wells at 3-32 and 2 wells at the 7-30 location. That is why I mentioned 7-9 wells in my previous post.
I was a bit confused by the status on the 2 wells at the 7-30 pad of drilling suspended, which would indicate that Crew set surface casing at those two locations and then moved over to the 3-32 pad to set surface casing on the remaining 7 locations. Currently it appears that they are drilling the main hole section and/or directional section on the wells at the 3-32 pad.
Crew should still be able to produce their wells during the drilling of the wells however they may have to shut them in during completion operations as I believe they mentioned that they use their pipeline to deliver water for fracing.
As for the 4.25 wells completed, I am unsure of what happened to the 5th well on the 3-32 pad. They may have only completed a portion of the horizontal leg and still have 75% of the reservoir unstimulated in that well. Perhaps they attempted to drill one of the other clinoforms in that well and have only completed the B zone so far. Or perhaps they had problems during the drilling of the well and they are unable to complete the entire horizontal section. That is a good question to ask as that well possibly represents an additional 800 Boe/day from the 3-32 pad.
I am still so excited to see Crew swinging for the fences with their drilling program. Unfortunately we will have to wait a little longer for an update as I noticed they moved the quarterly release date to November 9.