Surrey House installation date announced - again!How many times are they going to delay and announce the same thing installation? They still cannot be bothered to put up a single picture of the so-called palletted unit nor post a single picture of the progress at Surrey House. Same old same old cgi on the website as has been around since the ZincNyx days.
I sure hope the Surrey House guy had the foresight to add a gas fired or diesel fired generator to his plans. Guessing the house will also be tied into the BC Hydro grid as well. You know - just in case the solar and ZincAir combo do not work or do not perform as has been sold to them.
How much did this unit cost to build anyway? Is Zinc8 just donating it to Surrey House? Do they need someone on-site 24/7 to operate and maintain the system or can it be controlled from a remote operating center?
So many unanswered questions but the PR pump machine keeps on pumping even without a working product.