We should concentrate on the project Nice picture of the camp and the drilling .
Hoping to get news soon.
The 15 ( Hope) days turned around is 3 weeks late.
At the other end Hope does not mean Sure
https://www.js-research.de/fileadmin/user_upload/JS_Research_Tudor_Gold_08.11.20.pdf
25 Oct, 2020
Tudor Gold's Vice President of Project Development, Ken Konkin, P.Geo., stated: "The goal is to drill-define the limits of the Goldstorm system mineralization. We are very pleased with the results obtained from the 2020 drill holes that have yet to define limits or boundaries to the mineralized target along the northeastern and the southeastern axes, and to depth as well as we keep encountering mineralization versus non-mineralized host rock. Drill hole results from GS-20-75 demonstrate that several aspects of the mineralized horizon appear to be gaining strength at depth with significant Au-Cu-Ag mineralization encountered in the CS-600 zone which averaged 0.968 gpt AuEq over 414 meters. Our technical team has to date received drill hole results from 26 diamond drill holes at Goldstorm and three holes from the PSZ Zone, totaling 24,343.6 meters. Samples from 12 drill holes are awaiting results from MSA Labs, totaling 12,443.7 meters, with six additional holes currently being drilled that are expected to total more than 6,500 meters. The information released to date represents just over half of the drill information we plan to collect for this year's program at Goldstorm. We have also received good news from MSA Labs that they hope to get back to our scheduled 15-day turn-around-time for results. We are confident that our combined efforts will expediate the news flow for the near-future."