Start of Gen1 Reactor in December I think this health sector could help you a lot
The process engineering phase allowed the PyroGenesis technical team to run a series of computer simulations to ensure that the system works as planned. Satisfied with the result, the mechanical engineering work needed to start the build of the Gen1 PUREVAPTM NSiR was then completed.
There is something to learn and care.Check disclaimer on profile