RE:RE:RE:RE:Re Stuart InterviewYes jc. I am being optomistic. No money will show until all permits r in place.
I was thinking 125 mill for 20% was high after the 30% give away for nothing.
But perhaps high copper prices and some common sense will kick in.
I firmly blieve if tko could get 250 u.s. for 40% that would be proper.
That should give us a quick buck sp increase along with some gib traction.
As tko management keeps saying. No one is paying anything for pipeline.
So tko shares r cheap if they ever figure miners math is correct.
The pure cathode at florence will fetch a premium. Also why c1 is so low.
No con freight or treatment charges for the cathode so that is why c1 is lower I think.
Looks like 3.50 may have become support. Hi copper prices seam to b lifting the tko cloud a bit. As qs start getting answered, it should lift more.
Unless negative answers. I do not believe the water permit could need much by way of engineering other than perimiter well placement.
The fed permit could have some things to mitigate. I hope it gets resolved soon and I can realize a little bit from florence. If not permitted, then our 30 million pp just cost us 25 million per year for life of gib mine.
Happy hoping.
nf