RE:RE:This is what Whitmer is up againstretiredengexec I was very surprised to learn that line 5 bend radius exceeds the limits specified in the conditions of the MI Mackinac straits easement. What are your thoughts about how this happened? I can't imagine that even back in the 50's engineers didn't have the methods and instruments to properly measure that parameter during construction. The only logical conclusion is that this metric was either ignored to reduce costs (and payoffs made - to corrupt inspectors and/or polticians to turn their heads the other way), or there were difficulties encountered during the pipelaying process, the condition was relaxed/waived with consent of government officials, and the sign-off of these changes was somehow not documented or the documents were lost.