RE:RE:RE:Breaking NewsAnd therin lies the major predicament!!! Mill tonnage was increased rom 2700 to 3500/3800 tpd earlier this year. No one really adressed the implied increase in required drilling or development. At present mill rates , even at 1000 meteres per month development , heres only about six or eight weeks developed ore available at any one time. Blackhawk may chose to ignore these unpalletable facts but there is a physical limitation as to how much muck that can be moved thru the system on a daily basis.
Perron will do his best , but an outbreak of Covid , or falling POG, or ground control problems , or falling mill heads may negate his best efforts, Remember , or reserves are around 8.8 grams but mill heads are consistenly around 8,4 grams. That tells a story initself, and I suspect that 8.4 will not be achoied in Q4.