DrillingDrilling to start next week? Ship arrives friday , unloads in two days , on the paved road close to drill site ( approx.900 k from Walvis Bay ) , several days to set up and then the waiting is over and the drilling starts on the 6000ft. thick target.
OR
The rig is shipped by rail to about 140 miles from the drill pad and the drilling starts soon after.
Either way, the "Train "is leaving the station , so if you want the ride of a lifetime get on board NOW !!!,