RE:RE:ECA support for mining gets smaller – but smarterGot cut off.
Continue :
The first plan being long before 2012-13 when Woulfe Mining Corp. employed Contromation Energy Services in Jakarta to do the initial drawing and engineering work for the very fisrt process plant design.
I think 3 or 4 concepts were drawn up before a Woulfe approval of a full working design and 3D drawing project was also completed and ready to build (and I mean in detail ready to build).
That was all quashed when it was discovered that the proces plant foot print overstepped the mine site space. A massive waste of time, money and effort.
I think this was from 2008 to 2012 for the Contromation deal ?
.