Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Quote  |  Bullboard  |  News  |  Opinion  |  Profile  |  Peers  |  Filings  |  Financials  |  Options  |  Price History  |  Ratios  |  Ownership  |  Insiders  |  Valuation

Monument Mining Ltd V.MMY

Alternate Symbol(s):  MMTMF

Monument Mining Limited is a Canadian gold producer that 100% owns and operates the Selinsing Gold Mine in Malaysia and the Murchison Gold Project in the Murchison area of Western Australia. It has a 20% interest in Tuckanarra Gold Project, jointly owned with Odyssey Gold Ltd in the same region. Located in the Central Gold Belt of Western Malaysia, the Selinsing Gold Mine covers a total area of approximately 150.3 square kilometers (km2) and includes the Selinsing, Buffalo Reef, Felda Land, Peranggih and Famehub properties. The Murchison Gold Project includes the Burnakura, Gabanintha, and Tuckanarra properties, which are located in the Murchison goldfield of Western Australia, 40 kilometers (km) southeast of Meekatharra and approximately 765km northeast of Perth. Buffalo Reef lies continuously and contiguously along the gold trend upon which the Selinsing Gold Property is located. Both Felda and Famehub are located east and north of the Selinsing and Buffalo Reef properties.


TSXV:MMY - Post by User

Post by nozzpackon Dec 19, 2020 2:55pm
129 Views
Post# 32147490

A Scenario for Quickly Resuming Murchison Production

A Scenario for Quickly Resuming Murchison Production

2018 drilling program and the grades received indicate the significant underground potential for NOA 7/8 of NOA 7/8 at Burnakura .

A follow up program can easily be designed to both extend and define the mineralization at depth.


While a suitably powerful RC rig can perform follow up infill,  a DD rig would be needed to discover further extensions at depth.

The deposit is still clearly open at depth, with the potential to extend the resource further with deeper drilling.

Also, NOA has 114,000 ounces of oxides at 4.46 gms per ton which are open pitable.
Typical open pit grades are less than 1.5 gms per ton, so these ounces at 4.46 gms are going to have a very low cash costs.

Step 1...use the $4 m in cash from the Tuckie deal to initiate a substantial underground drilling program at NOA 8.

Step 2....Refurbish the existing 260,000 ton per year million at Burnie....if not already refurbished ( it was supposed to but I will confirm )

3....Reopen the mining camp and hire a mining contractor to resume production ( WGX provides such services)  

4...use the cash flow to fully explore and develop all of Burnie.

At 4.46 gms per ton, gold recovery will be above 90%.
I will use 90%.

So, we have 4.46 gms /ton times 0.90 % times 260,000 tons per year
=  1,040,000 gms per year divided by 31 gms per ounce = about 30.000 ounces per year and a mine life of just over 3 years.

Lets assume $1800 POG and a AISC of $ 900 per ounce.

Annual revenues are $54 million US per year and free cash flows of $ 27 million US  per year for 3 years.

By then, underground and extensional drilling will have discovered significantly more ounces at least below the pits in addition to the other 400,000 + ounces at Burnie and Gabby.

Use free cash flows to xpand the current mill to 1 million tons per year.
After 3 three, production can then be ramped up to 75,000 ounces a year.

If that mill is already refurbished, mining resumption should not take too long as the mining camp is already in place.

If Mengapher is sold we can buy the needed mining equipment and form our own mining team.

Remember, $1800 POG opens up lots of realistic possibilities than $1250 POG.
And we still are producing gold at Selinsing with strong working capital ( $30 m cad )  and no net debt..

So why would anyone sell ...



 

<< Previous
Bullboard Posts
Next >>