RE:RE:RE:RE:RE:Updatecskhurasu wrote:
PREs are usually on the optimistic side since the limits aren't known and the met work and pit engineering (slopes, strip, waste) are usually very sketchy. I think your estimates are likely going to be close. Do we know who is doing the estimate?
P&E Mining Consultants is mentioned as the group providing the drill spacing recommendations. Since that involved looking at all of the drill holes and evaluating consistency of the deposit, my best guess is that they would also do the estimate - just a guess however.