RE:Putting things in perspective!I believe that 5-8% chance of commercial success applies to drilling a flowing reservoir. This was my point in a previous post, we're not drilling a potential reservoir, we're drilling for source rock and to conduct seismic surveys. I'm no expert but I assume this gives us a greater chance of achieving success with this drill (but also means our upside won't be as huge as some have speculated). If we find source rock then we map the area and jv the blocks to the highest bidders. The whole risk v reward proposition changes when you own the rights to an entire basin, gives more optionality as opposed to a make or break drill on a single block. Nobody corrected me when I made this point previously so if my assumptions are wrong please let me know. Cheers