RE:RE:RE:RE:RE:Room to runSIC has an 8KM long property. NFG has about 100KM or more. I am not comparing SIC to NFG and that was not even considered 2 years ago when I got into SIC. NFG was still a private company.
SIC is on the same structural zone as Marathon. Although a lot of the drill results look similar to NFG. For many who have been in SIC early, if it can be a fraction of what NFG or Marathon have done, it will be a windfall. GLTA