RE:RE:Measured categoryIt was mentioned that they would be back up at TREATY to continue the 2020 drilling program after all of the Drillers had a good long Break and to be with their Families for these holidays. Just from my re-call they were expecting top break over 50,000 meters of drilling of the 2020 drill program. That said I am not sure if it was to be drilling at the Goldstorm or for exploration drill holes for the PSX project,,,either or even both sites may have additional drilling,,,,,,,and who knows if they get thru Winter into Spring time if they get permission from BC Bureau of mines and are issued the permits in hand to continue straight thru till nex Fall,,,,,why not. Depends on the Winter weather i suppose,,,,,but which is to be expected,,,,,,, My belief is Ken Konkin is aiming to keep drilling right on thru Spring into Summer then to the end of Fall 2021!!!!!!! With all of that why not as the 2020 drill cores are all down in the Lab going thru assaying to establish the Maiden resources proven and probable,,,,,we are getting closer are we not!