Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Quote  |  Bullboard  |  News  |  Opinion  |  Profile  |  Peers  |  Filings  |  Financials  |  Options  |  Price History  |  Ratios  |  Ownership  |  Insiders  |  Valuation

Radius Gold Inc V.RDU

Alternate Symbol(s):  RDUFF

Radius Gold Inc. is engaged in the acquisition and exploration of mineral properties and investment in companies, which hold mineral property interests. It has a portfolio of projects located in Mexico and Guatemala. Its projects include Plata Verde Project, Amalia Project (including the Palmillas Property), Holly Project, and Motagua Norte Project. The Plata Verde Project is located north of the Company’s Amalia Gold-Silver project and east of the Batopilas silver mining district. The Amalia Project is comprised of about 9,794 hectares (ha) located in the Sierra Madre gold belt in the State of Chihuahua, Mexico. The Holly property straddles the regional Jocotan Fault which forms part of the Motagua Suture Zone, about 400 kilometers (km) long by up to 80 km wide deformation zone that separates the North American and Caribbean plates. The Holly project is under a joint venture agreement with Volcanic Gold Mines. The Motagua Norte project has about 86 square kilometers land position.


TSXV:RDU - Post by User

Post by loonietuneson Jan 20, 2021 8:37am
141 Views
Post# 32332022

Drill results out today

Drill results out today

 

Radius Gold drills 23 m of 6.8 g/t Au at Amalia

 

2021-01-20 08:24 ET - News Release

 

Mr. Bruce Smith reports

RADIUS GOLD INTERSECTS 23M AT 6.8 G/T AU AND 321 G/T AG AT AMALIA PROJECT, MEXICO

Radius Gold Inc. has provided results from its phase four diamond drill program at the Amalia gold-silver project in Chihuahua, Mexico. Pan American Silver Corp., the project operator, has reported assays for the first three drill holes of the phase 4 program and new results include:

AMDD20-022 assayed 23.1 m at 6.8 g/t Au and 321 g/t Ag (estimated true width 14.5m)

including 6.25 m at 18.34 g/t Au and 813 g/t Ag.

Phase Four Drill Result Summary

Phase 4 drilling to date has completed 5 drill holes AMDD20-20 to AMDD21-25 for total 2,035 metres. Results have been received for holes 20, 21, and 22. Drilling is ongoing with drill hole 26 in progress and further drill holes planned (see figures 1 and 2 below).

AMDD20-022 intersected 23.1 m grading 6.8 g/t Au and 321 g/t Ag with an estimated true width of 14.5m, including 6.25 m (est. true 3.5 m) at 18.34 g/t Au and 813 g/t Ag. Hole 22 was drilled within the high grade San Pedro shoot previously defined by drill holes 9, 10, 14, 15 and 16. Drill hole 22 was drilled approximately 85 m down dip and on section from drill hole 14 (28 m at 2.3 g/t Au and 126 g/t Ag (see news release 13 June 2019) These drillholes define a continuous zone of high grade multi-phase gold-silver mineralization from surface to current drill defined depth of 300 m (see figure 1 below). Mineralization is hosted along the Amalia fault with disseminated fine black sulphides and sulphide veining commencing within rhyolitic ignimbrites, and transitioning to intense silicification, stockwork veining and brecciation at the contact with the lower andesite volcanic agglomerates.

AMDD20-020 and 021 were drilled on sections approximately 400 m and 300 m southeast of San Pedro along the Amalia fault zone and did not intersect significant mineralization.

Drilling is ongoing at Amalia and Radius will release further results as they become available. Radius and Pan American expect to complete 4,400 m in the current drill program.

The Agreement

Radius has granted to Pan American Silver Corp. the option to earn up to an initial 65% interest in the Amalia Project by making cash payments to Radius totaling US$1.5 million (of which US$400,000 has been received) and expending US$2 million on exploration over four years. Pan American may earn an additional 10% by advancing the property to preliminary-feasibility.

Technical Information

Bruce Smith, M.Sc. (Geology), a member of the Australian Institute of Geoscientists, is Radius's Qualified Person as defined by National Instrument 43-101 - Standards of Disclosure for Mineral Projects. Mr. Smith has reviewed and approved the technical information contained in this news release.

Quality Assurance and Quality Control

Drilling is carried out using NQ and HQ size tooling. Drill core is cut in half using a rock saw with one-half of the core then taken as a sample for analysis. Sample intervals are generally 1m intervals, producing samples of between 2 to 9 kg. Half-core samples are delivered to the ALS Geochemistry laboratory facilities in Chihuahua, Mexico. The samples are fire assayed for Au and are analysed for Ag and multi-elements using method code ME-ICP61 following a four-acid digestion. Overlimits are analyse d using an appropriate method. Multi-element geochemical standards and blanks are routenely entered into the drill core sample stream to monitor laboratory performance. Quality control samples submitted to ALS were returned within acceptable limits.

Radius Gold Inc.

<< Previous
Bullboard Posts
Next >>