Ferndale Port -- Petrogas/Altagas Facility
Vessel Cratis-LPG tanker has arrived into the FERNDALE port –late last night. Petrogas/Altagas is loading. I would assume about a 5 day fill period and a period of 19-20 days between tankers.
Arrival Departure Vessel TYPE GT Barrels Propane
Jan29 Feb4 Captain Markos LPG 47173 599,000
Feb17 Cratis LPG 48963 622,000
*Assuming 12.7 barrels / metric tonne
*600,000 barrels /20days= 30,000 barrels / day implied throughput rate of Ferndale.
GLTA
RFguy