GREY:VITFF - Post by User
Comment by
Whateverrron Feb 18, 2021 1:24pm
115 Views
Post# 32597115
RE:RE:RE:SF online video
RE:RE:RE:SF online video Exactly, as said forever. Almost NONE of the share were bought in the open market. They are merely options with zero risk awarded over 10+ years. As for mine design and plan, can you imagine, so poorly thought out and with brand new very expensive equipment, it has been a less them normal operation. Stuff not operating remotely close to plans. Ouch. Low guidance so future numbers will obviously beat that. MVargas wrote:
John doesn't need to keep telling his audience that he bought all his shares in the market because most were from the exercise of very cheap options awarded over a 12-year period.
3. The addition of a portable secondary crusher capable of crushing 1,000 tph or 24,000 tpd that can discharge directly onto the overland conveyor or into trucks for delivery to the HLP. This eliminates the risk of the primary crusher being shut down for repairs or maintenance as the annual production forecasts were dependant on the primary crusher operating 24 hrs/day, 365 days/yr. I'd expect that that both can and will operate simultaneously as well which will also increase ore production.