RE:RE:RE:Taseko Mines files form 6-Kkey points. Site cisrs dropped. Cap strip big drop. Throughput to increase. Grade to increase. 15 million dollars copper on the bank. Huge ore to stockpile. Two more months cash to the bank at this point.
Florence appears to be a go.
Should open 3.00 cad in the morn.
nf