News: Highrade intercepts at underground drill exploration!! Underground Exploration Drilling at Brucejack Extends Mineralization with High-Grade Intercepts
PVG
+5.14%
Pretium Resources Inc
Thu, February 25, 2021, 3:00 PM·15 min read
VANCOUVER, British Columbia, Feb. 25, 2021 (GLOBE NEWSWIRE) -- Pretium Resources Inc. (TSX/NYSE: PVG) (“Pretivm” or the “Company”) today announced high-grade gold mineralization has been intercepted in the first resource expansion drill program completed at the Brucejack Mine since commercial production commenced in 2017.
“These initial results validate our view that there is exciting extension potential at the North Block Zone of the Valley of the Kings deposit at Brucejack,” said Jacques Perron, President and Chief Executive Officer of Pretivm. “In 2020 we made a commitment to significantly increase our resource expansion and exploration efforts going forward, and these results from this first phase certainly support that investment.”
High-grade gold mineralization was identified in three new areas during Phase 1 drilling of the North Block Zone. Four intersections assayed above 1,000 grams per tonne gold. Results include high-grade gold mineralization intercepts up to 300 meters from the current resource shell, including 19.3 grams per tonne gold over 9.0 meters in VU-2792 and 2,590 grams per tonne gold over 1.0 meter in VU-2794.
The North Block Zone is located directly to the north of the Valley of the Kings deposit. The 2020 mineral resource expansion program was designed to test for Valley of the Kings style mineralization to the north and at depth. Phase 1 of the program was drilled from the 1050 level in the mine to target an area extending up to 300 meters north of the current resource shell. Phase 2 of the program was also drilled in 2020 to target an area up to 450 meters north of the current resource shell, and those drill results are pending.
North Block – Phase 1 Results
Phase 1 of the North Block resource expansion program comprised 7,011 meters in 38 drill holes. Drilling identified three new zones: (1) an extension of the Domain 13 Stockwork, which is currently being mined in the Valley of the Kings, (2) a newly identified corridor of gold mineralization in the footwall of the Domain 13 structure, located 300 meters north of the current resource shell, and (3) a previously unidentified zone of gold mineralization located within 50 meters of existing development.
For a plan and section view of the 2020 North Block Phase 1 program please see the following link: https://ml.globenewswire.com/Resource/Download/c5c5a7b4-2a1b-4d36-aa86-f4fe4fcdc008.
Significant drill results are shown below:
Hole VU-2661 intersected 11.3 grams per tonne gold over 27.0 meters, including 252.0 grams per tonne gold over 1.0 meters, and 1,045.0 grams per tonne gold over 1.0 meters.
Hole VU-2666 intersected 2,100.0 grams per tonne gold over 1.0 meters.
Hole VU-2792 intersected 19.3 grams per tonne gold over 9.0 meters, including 103.5 grams per tonne gold over 1.5 meters.
Hole VU-2794 intersected 2,590.0 grams per tonne gold over 1.0 meters.
Hole VU-2797 intersected 80.7 grams per tonne gold over 12.0 meters, including 941.0 grams per tonne gold over 1.0 meters.
Hole VU-2800 intersected 136.5 grams per tonne gold over 7.5 meters, including 861.0 grams per tonne gold over 1.0 meters.
Hole VU-2827 intersected 124.0 grams per tonne gold over 9.0 meters, including 1,110.0 grams per tonne gold over 1.0 meters.