RE:With only about 80 days left maximumWhy should Ximeigroup build the tantalum refinery with the small TTX resources of 40-50 Mt? If AVZ Minerals there 1000-1200 MT. So more than 30 times. Honestly folks, if Ximeigroup is interested then they will probably build with AVZ, because they at least have a plot of land on site. TTX does not have a plot of land, only tailings to be transported away, on which drilling has been carried out since 2019 and so far there is no proof of quality. At AVZ everything on the surface is badly weathered, this will be the same with the tailings that are on the surface. It is unlikely to be economical as AVZ has much better material to mine on site. The transport costs make the tailings uneconomical, far too much worthless material for little lithium, That's why AVZ Minerals didn't want the talings either