RE:RE:RE:Crew MoniasThanks to both of you, BeattheOdds and Beakr123.
Maybe we will hear more in a week from now.
BeatTheOddsSqua wrote: Gonat as I mentioned earlier Crew is drilling a bunch of wells and not saying anything about them.
This 4 well pad was not mentioned at the Winter Wonderland Conference and does not show up on the March 2021 Presentation.
The 4-17 wells will have 2 mile lateral sections and are in an area offset by huge gas production in the Groundbirch area.
If you look at slide 28 of the new presentation the wells are adjacent to Crew's pipeline just SW of the "One 12 and two 6 inch" label. The 4-17 Pad location is also located under that "mysterious blue star" on slide 23 and are drilled two miles SW of that point.
The wells will be easy to complete and tie-in to Crew's existing infrastructure in order to maintain or grow gas production rates in 2021-2022.
Great news to have these wells drilled so quickly. 4 more DUC's ready to be completed.