RE:RENAUD Adams on BNN today ...Interview ...
- why are costs still AISC $1300 ?
- RR AISC will be in the $1200 this year and below.
- NA transition from existing cave area to new cave aras needing $ 1/2 B up front, costs higher as grade is lower in exhausting the existing cave. Once B3 and C zone in production, capital costs are small. Resulting in Significant reduction in AISC.
- 2025 target is $800 AISC.
- spoke about tragedy