RE:5.6 G/T did i misscalculated???Yes rpm per PR in February the grade at Elder was a bit over 5.6gpt gold which is much better than the grades Elder has been producing over last several years, however, 5.6 gpt gold still doesnt reconcile with the supposed gold grades in reserve at Elder, which if memory serves me are about 6.4gpt gold. For years Renaud has been promising 12,500 tons mucked per month but February was only 8,255 tons so stope production missed mark by a very wide margin. Since Renaud provide no public disclosure on success or failure or exploratory drilling at Elder is is impossible to say whether the increase in grade was a result of stoping a new higher grade gold vein or simply instituting better mining methods underground i.e. grade control measures.