RE:Seabridge drilling?HIGHonLITHIUM wrote: Anybody hearing anything regarding the drilling that was supposed to be done on Treaty Creek by Seabridge this past summer? I seem to recall that the Seabridge drill core was supposed to be processed by Tudor.
Seabridge was to drill 40 holes along the tunnel route, ten last season. Core was to be made available to Tudor. Seabridge was not going to assay the material.